December 2019 update:
The Lord has blessed and we now have $12,000 raised for this project! We still are now lacking $8,000. We praise the Lord for what he has done, but there is still an opportunity for you to get involved in this need! Help us pray for this great ministry in Nairobi, and pray about your involvement. Click the "Donate" box below to help with this project!
nairobi outreach baptist church project
To establish the Nairobi Outreach Baptist Church on their new plot of land so that they can reach the lost, make disciples, and be the headquarters for future church planting efforts in the region. Nairobi Outreach Baptist Church is currently the home of the Providence Baptist College in Central Kenya.
Dear Praying Friends,
The next big step in our Central Kenya ministry is to begin building at the new location for the Nairobi Outreach Baptist Church. We have the land completely paid for, and now we must move the church to the new location. This church is the headquarters for our Central Kenya ministry and it is essential that we establish them at the new location before we can move forward with other projects.
We need your help to meet this urgent need! Please feel free to go through this list and pray for these needs. If you would like to pay for any part of this project, then we would greatly appreciate it!
Click the DONATE buttons on this page to help with this project!
The project will be completed in Five Phases:
Phase One: Outer Wall Construction (Size 100×150 ft)
1. Foundation stones 1200 ft - $600
2. Stones dressed - $1,200
3. Ballast - $560
4. Sand - $1,050
5. Cement 150 bags -$1,000
6. Steel works D12 , 40 pcs - $360
7. D8 22 pcs -$99
8. Bidding wire - $35
9. Hoop iron- $50
10. Grill Works and Gate - $700
11. Labour- $1,000
12. Other misc costs - $500
(Outer Wall Construction Total Cost: $7,150)
Phase Two: Storage and Office Building Construction (Size 26×12 ft)
1. Dressed Stones 1000 ft - $600
2. Foundation Stones 270 ft - $300
3. Sand 60 t - $700
4. Ballast - $280
5. Cement 100 bags - $620
6. Other Works: Ring beam, Roofing, Doors and Window Grills, Tiling etc - $1850
7. Water - $200
8. Labour - $800
9. Misc expenses - $500
(Storage and Office Building Construction Total Cost - $5,850)
Phase Three: Washroom Construction
1. Pit Septic Excavation $700
2. Top Slab Construction & Roofing Slab (steel work and concreting) - $1,000
3. Stone Walling - $200
4. Sand 20 t - $200
5. Ballast - $140
6. Cement 50 bags - $310
7. Others eg. Asian toilets, tiles etc. - $200
8. Plastic tank 5000 - $200
9. Labour - $700
10. Water - $80
11. Misc expenses - $270
(Washroom Construction Total Cost - $4,000)
Phase Four: Tent Relocation
1. Floor slab 254 pcs - $640
2. Ground Leveling - $200
3. Cement 10 bags - $62
4. Sand - $170
5. Ballast - $150
6. Transport - $50
7. Labour - $400
8. Misc expenses - $150
(Tent Relocation Total Cost - $1,822)
Phase Five: Utility Connections
1. Electricity Application and Connection $250
2. Electrical Installation and Wiring $300
3. Water Connection Application and Metering $200
4. Piping from Source to Site - $400
(Utility Connections Total Cost - $1,150)
The cost of the entire project will be $19,972. Please help us pray for this urgent need, and please prayerfully consider being a part of this urgent need!
His for Kenya,
Spencer Smith